SolarSathi

Rooftop solar savings & subsidy calculator

See how much a rooftop solar system could save on your electricity bill — including estimated PM Surya Ghar central subsidy, net cost, and payback period. Built for Indian homeowners across every state and UT.

Your electricity usage

Calculate using

JVVNL, AVVNL and JdVVNL share the same RERC domestic energy rates — DISCOM is for your reference only.

Why estimate before you go solar?

Most households over- or under-size their first rooftop system. Starting with your monthly bill (or units) gives a realistic kW target, a subsidy ballpark under PM Surya Ghar, and a payback window you can compare against quotes from verified installers on SolarSathi.

After you see results, request an exact quote — we share your inputs with partner brands so they can respond with site-specific pricing, not generic estimates.

Frequently asked questions

How does this solar calculator work?

Enter your monthly electricity bill or units (kWh), select your state and roof type. We estimate monthly consumption, recommend a system size using ~120 units generated per kW per month, then apply PM Surya Ghar central subsidy rules and a typical installed-cost range of ₹55,000–₹75,000 per kW.

What is the PM Surya Ghar subsidy?

Under the PM Surya Ghar Muft Bijli Yojana, residential rooftop systems can receive central financial assistance of ₹30,000/kW for the first 2 kW plus ₹18,000 for the 3rd kW, capped at ₹78,000. Special-category states and UTs (North-East, Uttarakhand, Himachal Pradesh, J&K, Ladakh, Andaman & Nicobar, Lakshadweep) receive higher CFA, capped at ₹85,800. State top-ups, if any, are not included here.

Is the recommended kW size accurate?

It is a first estimate based on your bill or units. A site survey will refine size based on roof area, shading, sanctioned load, and how much of your daytime consumption you want to offset. We round to the nearest 0.5 kW with a minimum of 1 kW.

Does roof type change the savings numbers?

Roof type does not change the subsidy or generation math in this estimate, but it matters for mounting design and installation cost. We capture it so installers can prepare a more accurate quote when you request one.

Will I get the full subsidy shown?

Eligibility depends on government guidelines, DISCOM registration, vendor empanelment, and application approval. Figures here are indicative CFA amounts for planning — not a guarantee of disbursement.